METHOD OF PLACING SECONDARY LINING CONCRETE
- 申请公布号:
- JP2002030893(A)
- 申请号:
- JP20000219321
- 申请日期:
- 2000.07.19
- 申请公布日期:
- 2002.01.31
- 申请人:
- NISHIMATSU CONSTR CO LTD
- 发明人:
- TOMOHARA KEN;KAWAMURA MASAMI;SATOU KUMEJI;MAEDA SHOICHI
- 分类号:
- E21D11/10;(IPC1-7):E21D11/10
- 主分类号:
- E21D11/10
- 摘要:
- PROBLEM TO BE SOLVED: To easily and sufficiently compacting the secondary lining concrete even at a top end part and both shoulder parts of a tunnel. SOLUTION: A guide rail 2 is provided in the tunnel extending direction in a clearance 130 between a segment 120 and a center 110, and a bar-like vibrator 2 to be moved along the guide rail 2 is provided. The concrete is placed into the clearance 130 from an existing side (for example, a wrap part 3 side) while compacting the concrete with the bar-like vibrator 1, and the bar-like vibrator 1 is moved along the guide rail 2 from the existing side to an end sheathing 4 side while placing the concrete. The guide rail 2 works as a setup beam for the secondary lining concrete 100.
Copyright Notice © 2009-2024 传众 版权所有